UNDERPASS BRIDGE CONSTRUCTION OF FLORYA RAILWAY |
|
The main purpose of the underpass which is planned to be constructed in location of Florya Şenlikköy to divide the railway route into two with 2 lanes which means the lane on the sea side will be one direction with 2 lanes and the lane on the land side will be one direction with 2 lanes also and as a result of this traffic load of the road will decrease. The work consist of 5.000 meters of Ø100 mm bored pile, 2.750 m² side panel production, 20.000 m³ filling work for the road, 7.500 m³ concrete production, 12.500 m road kerbstone works, 25.000 m² sidewalk construction, 1.000 ton reinforcement steel, 3.500 m canal works with various diameters, displacement works of lines of İGDAŞ, 200 electric lightening poles, 300 m³ production of prestressed beam. |
|