Projects

  RECLAMATION WORKS OF GOLDEN HORN
  5.000.000 m³underwater dredging of mud at bottom have been executed and 4 cutter-suction dredger, 1 guide dredger, HDPE pipes with total length of 28.000 m and with diameter Ø500 mm have been used for construction and execution of Water Catchment Fill Dam with total rock clay fill volume of 1.250.000 m³ have been executed.