|
EUROPEAN SIDE PHASE V MISCELLANEOUS SEWAGE AND STORMWATER CHANNEL CONSTRUCTION |
|
Construction of sewerage and storm water lines has been executed with total length of 155.000 m and with various diameters in various districts in European side of İstanbul. |
|